A Photo Blog to view Progress
Monday 16th February 2009
Concrete floor/roof poured oiver reception area,
kitchen and dining room. Below the pouring of the concrete
Some close -ups - concrete over kitchen and dining room
Concrete over reception area and wall of chapel
At the rear wing the shuttering for concrete to support roof
The story of the pouring of the concrete
The concrete lorries line up on the avenue
The concrete lorry and crane-feed line up
The crane swings to where the pouring begins
Human help to point the concrete flow in the right place
Levelling the poured concrete
Job nearly done over reception area
Conctere left to settle and dry.